Getting the most from your runs
Last updated October 29, 2026
Let the weekly schedule do the work
- Your first run starts on its own once your project has a plan, prompts, and competitors. It doesn't use up an on-demand run.
- Every project is measured weekly, on the same day each week, without you doing anything. Scheduled runs never use up your on-demand runs.
- AI answers change slowly. Engines pick up new pages and reviews over days to weeks, not hours, so a weekly run catches real movement.
- A trend needs several weeks of runs. One week to the next is often noise; three or four weeks in the same direction is a signal.
When to use Run now
| Situation | Run now? |
|---|---|
| Right after setup | No — your first run starts on its own. |
| You changed prompts, competitors, or your brand | Only if you can't wait for the next weekly run, which picks them up. Make changes in a batch, then run once. |
| A run failed or came back incomplete | Yes — and a failed run doesn't use up your on-demand runs. |
| Before a client meeting or report | Only if the latest run is several days old. |
| You published a fix and want to see if it worked | No — engines haven't picked it up yet. Watch the next two to four weekly runs. |
| Checking for movement day to day | No — a same-day re-run mostly shows noise. |
Your on-demand runs
- Your organization gets on-demand runs worth 4 full runs of your plan per billing period — 4 × your plan's prompts, shared across your projects. A run uses as many as its project has, so a small project can run more often than a large one. During a free trial it's 4 full runs (9 during a design partner's free month). It resets when the next period starts.
- At most 3 runs of one project in any 24 hours.
- Failed runs don't use up your on-demand runs, and neither do scheduled runs or your first run. A failed run that still got answers back does count toward the 24-hour limit.
- The Run now button shows how many more runs of that project you have left.
A good first two weeks
- Day 1: check your prompts and competitors. Your first run starts on its own, and results take from minutes to a few hours.
- After your first results: drop prompts that don't reflect how your customers ask, add the competitors that keep showing up, then Run now once more.
- Weeks 1 and 2: two scheduled runs arrive on their own, giving you a first trend. Start on the top items in the Fix-It Playbook.
Reading a change
- Every score has a margin of error. A change smaller than the margin isn't a real change — see What the ± margin means.
- Compare runs on your project's Runs History page puts any two runs side by side and only calls a change real when it clears the margin.